What changes
One record in place of five workarounds
What it replaces
- Spreadsheets of check dates
- Email chains with contractors
- Paper invoices
- Folders of certificates
- Service charge letters made by hand in Word
What you get
- Alerts before every check, renewal and insurance expiry
- Each repair tracked from report to sign-off
- Invoices approved before anything is paid
- Certificates filed against the asset or check they prove
- Demands, statements and arrears letters on your headed paper
See it in action
Everyone gets the view they need
Screens from our demo building, Harbour View. All names and data are made up.




Who uses it
Five groups, one shared record
Everyone signs in to the same system and sees only what they need.
Building managers
The whole building at a glance, and control of every decision.
- Live dashboard of open jobs, emergencies and checks due
- Priorities from P1 Emergency (4 hours) to P4 Planned
- Approve, query or reject every invoice
- Set what each role, or each person, can do
Concierge and site staff
Deal with most things on the spot, from the desk or a phone.
- Log a repair in seconds, with photos
- Record checks as they are done
- Post notices about lifts, water and alarm tests
- Add residents and send their invitation
Residents and leaseholders
A simple view with no jargon.
- Report a repair or hazard and follow it until it is fixed
- Read notices and shared documents
- See their service charge balance and download a statement
- Only ever see their own repairs and account
Contractors
Clear instructions and a quicker route to being paid.
- Jobs arrive by email with a link
- Update status, notes and photos from site
- Upload service reports and certificates
- Send invoices and see when they are paid
Finance teams
Keep approval and payment apart, if you want to.
- Managers approve, finance pays
- A "ready to pay" email for each approved invoice
- Run service charge and ground rent billing
- One setting turns it on or off
A repair a resident reports becomes the contractor's job, the manager's sign-off and, finally, an invoice for finance to pay. Nobody retypes anything.
Compliance and planned maintenance
No due date slips by unnoticed
- Every check has a schedule. What it is, the rule behind it, how often it is due, the contractor and the asset.
- The next date is worked out for you from when the check was last done.
- Alerts go out early. By default 42 and 7 days before statutory checks, 14 days before planned maintenance and 30 days before a contractor's insurance runs out.
- One tap raises a work order for the contractor.
- Record the result with its certificate. The date rolls forward and the evidence is filed against that check.
| Check | How often | Rule or standard |
|---|---|---|
| Fire alarm test | Weekly | BS 5839-1 |
| Emergency lighting flick test | Monthly | BS 5266-1 |
| Flat entrance fire door checks | Yearly | FS(E) Regs 2022 |
| Sprinkler service | Every 3 months | BS EN 12845 |
| Fire risk assessment review | Yearly | RRO 2005 |
| Safety case report review | Yearly | BSA 2022 |
| Legionella risk assessment review | Every 2 years | HSE ACoP L8 |
For a higher-risk building Storeywise can preload more than 25 common checks. The list is a starting point: adjust it to your own fire risk assessment and your contractors' advice.
Invoices and billing
Money in both directions
Paying contractors
- The contractor submits the invoice against the job.
- A manager checks it, then approves, queries or rejects it.
- The manager or the finance team pays and records the reference.
- The contractor sees it is paid. Every step is logged.
Service charge and ground rent
- Enter the total. Storeywise splits it by each flat's share and warns you if shares don't add up to 100%.
- Service charge demands carry the landlord details required by s.47 and s.48 of the Landlord and Tenant Act 1987, with the summary of rights attached.
- Ground rent notices use the s.166 form.
- Preview drafts, then issue: numbered, locked and emailed.
- Payments, balances, statements and two-stage arrears letters.
Have your solicitor or managing agent confirm the statutory wording before your first run.
Quick to set up
Bring your existing records with you
No retyping. Your lists and documents go straight in.
Import your lists from spreadsheets
Download the ready-made template, fill in a tab for each list and upload it.
- See a row-by-row preview, with any problems flagged, before anything is saved.
- Already have your own spreadsheets? Common column names, such as "Supplier" or "Phone", are recognised for you.
- Export everything back to spreadsheets whenever you like.
Upload documents in seconds
Certificates, the fire strategy, the safety case, drawings, insurance and photos, all in one place.
- Link each file to the building, an asset, a check, a job or a contractor.
- Choose who can see it: the building team only, contractors too, or everyone.
- Add an expiry date and get a reminder before it runs out.
- Contractors upload their own service reports and certificates against the job.
Safe, secure and accessible
Built for personal and financial information
- Two-step verification for managers, staff and finance.
- Everyone sees only what they need. Every permission is checked on the server.
- Encrypted bank details.
- Hosted in Europe (Frankfurt), with a private database that can't be reached from the internet.
- No advertising trackers. Fonts are served by Storeywise itself.
- A full audit log of who did what and when.
- Accessible: built and tested against WCAG 2.2 AA.
- Your data is yours. Export everything to spreadsheets or one ZIP at any time.
Sets itself up for your kind of building
Each type switches on the right features and comes with its own starter list of checks. Role names can be changed to match your organisation, for example Business manager or Director.
See it with a demo building
We'll walk you through a fictional building with made-up residents, jobs and checks, so you can try every role safely.
- Email us your building type and roughly how many flats or units.
- We arrange a 30-minute walkthrough.
- If it fits, your building gets its own private copy at its own address.